Spirit Elements Huron Pool Cabana Assembly Instructions Page 7
14.
When all walls are attached
together, check alignment with the
floor. Bottom of wall frame should
sit flush with outside of plywood
floor / floor joist framing, with siding
overhanging.
When positioned correctly, fasten
bottom wall plates to floor using
4 - 3" screws per wall panel.
bottom of
wall frame
11.
Continue to add wall panels working around the shed. Position and
attach as per
Step 10. Take time to ensure wall panels are facing right side
up. Remember also that window and door configuration is arbitrary and can
be positioned to fit your needs best.
12.
Attach both
Vertical Door Jambs to door
opening wall studs with 3 - 3" screws per jamb.
Position so jamb is flush with outside wall paneling.
13.
Attach
Door Header to vertical door
jambs with 3 - 2" screws per side. Make sure
jamb is flush with outside wall paneling once
again. Screw from door header into door
jambs.
Flush
on
Outside
SpiritElements.com | cs@SpiritElements.com | Fax: 1.800.511.1421 | Toll Line: 1.800.511.1440 | 80301, Colorado, Boulder, 6672 Gunpark Drive
Page 7