Note: The floor will be flipped
over and floor runners will sit
on your foundation. It is
important to note that having a
level foundation is critical.
Choosing a foundation will vary
between regions. Typical
foundations can be concrete
pads or patio stones positioned
underneath the floor runners.
4.
With Floor Runners attached, carefully
flip the floor over and place on your
foundation.
Caution- you will need 2
people to assist you. Be careful when
laying floor down not to bend or twist floor.
When in place, level floor completely.
Concrete Slab
Foundation
5.
Position
Plywood Floor pieces (3) on top
of completed floor joists. Plywood will sit flush
with outside of floor joist frame. When in
correct position, attach with 1 1/2" screws.
Use screws every 16".
Hint: Use a chalk line
to mark location of
floor joists to
determine screw
placement.
Front
6.
When completed, make sure
the floor is still level and make
adjustments if required. When
completed, your floor should look
similar to this.
Foundations
Completed floor framing prior to flipping over.
Completed Floor
Page 4
6672 Gunpark Drive, Boulder, Colorado, 80301 | Toll Line: 1.800.511.1440 | Fax: 1.800.511.1421 | cs@SpiritElements.com | SpiritElements.com
Important -
Make sure floor is
level before moving
on to wall section. Use
a level to confirm and
shim floor joists as
required.