Spirit Elements Huron Pool Cabana Assembly Instructions Page 3
1.
Lay out
Floor Joist Frames as
illustrated at left.
2.
Attach the floor joist frames together
with 6 - 3" screws per section.
Attached, your floor joist section should be
105" wide x 75" deep.
A. Floor Section
3.
Attach
Floor Runners to completed floor
frame. There are 2 floor runners per 105" side and
3 completed runners in total. Use 3" screws.
75"
105"
Rea
r
Plywood Floor
Large (2)
Floor Joist
Frames (3)
Floor Runners
Short (3)
Floor Runners
Long (3)
Plywood Floor
Small
Exploded view of all parts necessary to complete
Floor Section. Identify all parts prior to starting.
SpiritElements.com | cs@SpiritElements.com | Fax: 1.800.511.1421 | Toll Line: 1.800.511.1440 | 80301, Colorado, Boulder, 6672 Gunpark Drive
Page 3
Concrete Pad
(optional foundation method)