29.
Screw first filler shingle down to
rafters using 1 - 3" screw per panel.
Make sure to screw into rafter.
30.
Slide in another filler shingle and attach as
per
Step 29. On your last row of shingles, the
filler shingle is precut to fit properly. Attach to
roof with 2 finishing nails per shingle.
Attach above the
exposure line.
Exposure Line
26.
When roof is positioned correctly, screw all outside rafters to gable framing with 4 - 2" screws
per side. Attach strong ties to walls with 2 - 1 1/2" screws per tie.
28.
Roof
Filler Shingles are included to cover
roof seams. Starting at the bottom, slide the first
24" long shingle in until flush with other bottom
shingles.
DO NOT ATTACH UNTIL STEP 29.
27.
Roof Gussets are positioned on middle
rafters of each roof panel. Prior to attaching
, make
sure walls are aligned correctly. Have two helpers
push the front and rear walls from the outside of
shed until inside to inside measurement between
front and rear plates is 70". Attach gussets with 4
- 1 1/2" screws.
70" across
gab
le f
rami
ng
Page 12
6672 Gunpark Drive, Boulder, Colorado, 80301 | Toll Line: 1.800.511.1440 | Fax: 1.800.511.1421 | cs@SpiritElements.com | SpiritElements.com