Find Docs

Stough Design Company - 07531 Single Ply Mem. Rfg (Page 2)

Wodocs >> Arts : Design >> Stough Design Company 07531 Single Ply Mem. Rfg Page 2
Stough Design Company - 07531 Single Ply Mem. Rfg
D+GA Project No. 9926
EPDM Single-Ply Membrane Roofing
16 October 2001
07531 - 2
B.
Samples for Verification: Of the following products:
1.
12-by-12-inch square of sheet roofing, of color specified, including T-shaped side and end lap seam.
2.
12-by-12-inch square of roof insulation.
3.
12-by-12-inch square of walkway pads.
D.
Installer Certificates: Signed by roofing system manufacturer certifying that Installer is approved, authorized, or
licensed by manufacturer to install specified roofing system.
E.
Manufacturer Certificates: Signed by roofing manufacturer certifying that the roofing system complies with
requirements specified in the "Performance Requirements" Article. Upon request, submit evidence of meeting
requirements.
F.
Manufacturer's Pre-Installation Notice: Signed by roofing system manufacturer certifying that Installer has notified
Manufacturer of project requirements, including scope of roofing system work and installation schedule.
1.
Manufacturer's Pre-Installation Notice shall be forwarded to Construction Manager no later than seven (7)
days after award of contract to Installer.
G.
Qualification Data: For firms and persons specified in the "Quality Assurance" Article to demonstrate their
capabilities and experience. Include lists of completed projects with project names and addresses, names and
addresses of architects and owners, and other information specified.
H.
Product Test Reports: Based on evaluation of tests performed by manufacturer and witnessed by a qualified
independent testing agency, indicate compliance of components of roofing system with requirements based on
comprehensive testing of current product compositions.
I.
Research/Evaluation Reports: Evidence of roofing system's compliance with building code in effect for Project, from a
model code organization acceptable to authorities having jurisdiction.
J.
Maintenance Data: For roofing system to include in the maintenance manuals specified in Division 1.
K.
Warranty: Sample copy of standard roofing system manufacturer's warranty stating obligations, remedies,
limitations, and exclusions of warranty.
L.
Inspection Report: Copy of roofing system manufacturer's inspection report of completed roofing installation.
1.07
QUALITY ASSURANCE:
A.
Installer Qualifications: Engage an experienced installer to perform work of this Section who has specialized in
installing roofing similar to that required for this Project and who is approved, authorized, or licensed by the roofing
system manufacturer to install manufacturer's product.
B.
Preinstallation Conference: Before installing roofing system, conduct conference at Project site to comply with
requirements of Section 01200 - Project Meetings. Notify participants at least five (5) working days before
conference.
1.
Meet with Owner; Architect; roofing Installer; roofing system manufacturer's representative; deck Installer;
and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-
mounted equipment.
2.
Review methods and procedures related to roofing installation, including manufacturer's written instructions.
3.
Examine deck substrate conditions and finishes for compliance with requirements, including flatness and
fastening.
4.
Review loading limitations of deck during and after roofing.
5.
Review flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of
other construction that will affect roofing.
6.
Review governing regulations and requirements for insurance, certificates, and inspection and testing, if
applicable.
7.
Review temporary protection requirements for roofing system during and after installation.
8.
Review roof observation and repair procedures after roofing installation.
9.
Document proceedings, including corrective measures or actions required, and furnish copy of record to each
participant.

<< Previous       1 2 3 4 5 6       Next >>



Other Documents:
07710 Manuf. Roof Spec, 08211 Flush Wood Doors, Conference Brochure, bbsubmit, Lender Package, Iub Ds V FC& MC, telegraff 0604, Huggies FR, Huggies NL, Huggies reglement FR, Huggies reglement NL, chronixreport 2004, CDLIUSPRfinal, eye Mediapack 06, RFP, 04 NFFcall, callforentries, nfc membership form, Na FFMEDIACREDENTIAL 2007, 2007 Na FF CFE, Meetings For You Planner Agreement, sample spreadsheet modified updated, confettiorderform, AJO 02 166 R 2, AJO 02 320 R 1, AJO 02 333 R 2, AJO 02 91 R 1 revised, AJO 2875, AJO 2890, AJO 2892, AJO 2917, AJO 2945, dreamorder, rating requirements, 200403437 ACC Flyer, 4 23 03 Q 1 03, Q3 02 Results Final, Q4 02 Results, Coupe Venue Info, entryforms 06, forms, Bridging The Gap, Business Tip 1new, HCDSNewslettersept., Personal Development Quiz, Salon Owners Quiz, Salon Ownernewsletter 1, Salon Owners Quiz, 2004submit, MIFFschedule,


WODocs | |
All rights reserved. wodocs.com© 2009
WODocs


New Docs

Documents Category:
Arts (Design, Movies, Music, Radio, Television)
Automotive (Cars, Marine, Motorcycle, ATV, Snowmobiles)
Business (Biotechnology and Pharmaceuticals, Chemicals, Construction and Maintenance, Materials, Real Estate, Services)
Electronics (Computers, Motion Control, Power Supply)
Games (Board, Family, Party, Card, Construction, RC Toys)
Health (Animalm, Beauty, Healthcare, Medicine, Pharmacy, Surgery, Weight Loss)
Home (Accessories, Cooking, Decor and Design, Electrical, Family, Pets)
News (Newspapers, Sports, Television)
Recreation (Collecting, Hiking, Scouting, Survival, Travel)
Reference (Education, Libraries and Archives, Museums)
Science (Agriculture, Astronomy, Biology, Chemistry)
Shopping (Antiques and Collectibles, Clothing, Flowers, Food, Home and Garden)
Sports (Bicycle, Snowboard, Skiing, Other)