D+GA Project No. 9926
Bid Package Summary
16 October 2001
3
O.
Bid Package No. 14 - Ceramic Tile::
1.
Reference all documents for extent of ceramic tile for floors and walls.
P.
Bid Package No. 15 - Acoustical Ceilings:
1.
Reference all documents for extent of acoustical ceilings. Includes acoustical ceiling support system; panels and
insulation.
Q.
Bid Package No. 16 - Resilient Flooring:
1.
Reference all documents for extent of resilient flooring. Includes vinyl composition tile flooring and rubber wall
base and accessories.
R.
Bid Package No. 17 - Painting:
1.
Reference all documents for extent of painting. Includes joint sealers, painting, and staining.
S.
Bid Package No. 18 - Toilet Compartments and Accessories:
1.
Reference all documents for extent of toilet compartments and toilet room accessories Coordinate installation
of concealed blocking required for installation of the work of this Bid Package with work of Bid Package No.
13.
T.
Bid Package No. 19 - Signage:
1.
Not In Contract.
U.
Bid Package No. 20 - Plumbing Systems:
1.
Reference all documents for extent of plumbing systems. Includes all material and labor for connections to new
domestic water, natural gas, and sanitary sewer utility services within 5 feet of the exterior of the building
(including trenching and backfilling required for installation of underground piping into building and under
floor slab); building services piping and plumbing fixtures and equipment for complete and operating systems.
V.
Bid Package No. 21 - HVAC Systems:
1.
Reference all documents for extent of HVAC Systems. Includes all material and labor to install fully-
functioning HVAC systems with controls (including roof equipment curbs, package rooftop units, ductwork, air
inlets and outlets, exhaust fans, etc.). Provide general temporary heat as specified in Section 01500 -
Construction Facilities and Temporary Controls.
W.
Bid Package No. 22 - Electrical Work:
1.
Reference all documents for extent of electrical work. Includes material and labor for all work of Division 16.
Provide new underground service connections from existing electric, telephone, and cable television utilities to
the new building (including trenching and backfilling, piping, and concrete encasement required for installation
of underground conduits). Provide conduit, boxes and pull strings for telephone, data, and cable television
outlets. Provide temporary electric power and light as specified in Section 01500 - Construction Facilities
and Temporary Controls.